Skip to content
MINING & MINERAL PROCESSING / UZ / PACKAGE 28

Tailings & Process Water Packages.

Electrical, instrumentation and control hardware documentation for defined subcontract packages in Uzbekistan.

01 / EQUIPMENT & INTERFACES

Recognise the equipment.
Define the output.

process water pumps · reclaim water · sump level · telemetry · filtration

Possible remote documentation support for Mineral processing OEM / approved EPCM / water skid contractor. Final code basis, scope and deliverable register are agreed with the client.

process water pumpsreclaim watersump leveltelemetryfiltration
02 / ENGINEERING DELIVERABLES

A defined package.
Not a whole EPC contract.

These deliverables can be selected individually. Scope can be limited to drafting or document review under the client's engineering leadership.

01Pump/valve I/OIssued XLSX/CSV register: tags, signal types, destinations and source/revision references.
02instrument indexIssued XLSX/CSV register: tags, signal types, destinations and source/revision references.
03RTU panelsIssued controlled PDF and editable source/register where included in the agreed document register.
04cable schedulesIssued XLSX/PDF report: cable/core or terminal references, destinations and connection details.
05P&ID/interface document checksIssued controlled PDF and editable source/register where included in the agreed document register.
06 / OPTIONALI/O List / Signal Register (AI, AO, DI, DO)Signals, channel assignments and interfaces; optional if not already included.
07 / OPTIONALControl Panel GA / Internal LayoutMounting plate, DIN rails, wire ducts, devices and clearances; optional panel scope.
08 / OPTIONALBill of Materials (BOM) / Device ScheduleManufacturers, part numbers, quantities and references; optional panel scope.
Issued documentation, not just engineering hours.

Each selected deliverable is entered in an agreed document register with revision, review stage and file format. Native EPLAN/DWG files, PDFs and XLSX/CSV registers are provided only when included in the RFQ. Optional items shown above are not included automatically.

See typical issued documents & formats ↗

Related document example (in preparation): Flotation Reagent Dosing Package ↗

03 / CLIENT INPUTS & QA

From project inputs
to review-ready files.

Client provides

  • Approved P&IDs, equipment list and functional/design boundaries
  • Current vendor package drawings, tags and instrument datasheets
  • Instrument/motor quantities and required file formats (EPLAN, PDF, XLSX as agreed)
  • Owner's standards register and controlled document numbering templates

Typical review activities

  • Identify unresolved P&ID, tag and interface discrepancies
  • Map device signals, terminal/wire IDs and instrument references
  • Check BOM, I/O, loop and cable schedule consistency
  • Issue comment register and agreed revision for client approval

Acceptance conditions

  • Named engineering reviewer on customer's side
  • Defined technical assumptions and change-control route
  • Mutually approved deliverables, format and number of revisions
  • Any site sign-off and regulated acceptance outside remote package
04 / APPLICABLE REFERENCES

Equipment requirements.
Then local rules.

Listed standards are potential design references, not universal compliance claims. The responsible engineer confirms application, edition, contractual adoption and local rules.

TECHNOLOGY / PROCESS

Relevant technical codes

IEC 61439 if LV assembly; country site electrical rules; owner environmental specifications; IEC 61082 / IEC 81346 for drawing structure and equipment identification where adopted.

Requirements vary by equipment construction and process classification.
UZ / MACHINE & ELECTRICAL

Uzbekistan context

Client-adopted IEC and national O‘z DSt/related standards; no automatic assumption that Russian or Kazakh PUE applies.

Applicable Uzbekistan PUE, O‘z DSt / national technical regulations, local energy/industrial requirements and approval route.

Fixed site installation and product documentation are separate work scopes.
CLIENT-OWNED RESPONSIBILITY

Excluded from this package

Tailings dam safety, flood/environmental controls and regulated site approvals excluded; only noncritical auxiliary documentation.

Safety of machinery, local mining permits and critical protective functions are retained by the appointed owner / OEM design authority.
ASSEMBLY STANDARD / WHEN APPLICABLE

IEC 61439 and cabinet design

For in-scope low-voltage switchgear/controlgear assemblies, apply IEC 61439-1 together with the relevant product part (typically IEC 61439-2), subject to national adoption and the project specification. IEC 60204-1 may also apply to machine electrical equipment.

Engineering drawings are not evidence of assembly conformity. The responsible manufacturer retains design verification, routine verification, product conformity and approval duties unless separately assigned to a qualified party.
Other markets for this equipment
Kazakhstan ↗Netherlands ↗
05 / NEXT STEP

Have a defined E&I
work package?

Share equipment type, project country, document register, available data and requested deliverables. No confidential drawings in the public form.

Discuss this engineering scope ↗
REMOTE SUBCONTRACT BOUNDARY

The client retains process design authority, site engineering, statutory approvals and safety-function validation. Documentation outputs and review procedures are agreed before start.

← Back to equipment