Oil Custody Transfer / LACT Skids.
Electrical, instrumentation and control hardware documentation for defined subcontract packages in United Kingdom.
Recognise the equipment.
Define the output.
LACT · prover interface · flow meter · densitometer · sampling · ESD permissives
Possible remote documentation support for Metering skid OEM / measurement integrator. Final code basis, scope and deliverable register are agreed with the client.
A defined package.
Not a whole EPC contract.
These deliverables can be selected individually. Scope can be limited to drafting or document review under the client's engineering leadership.
Each selected deliverable is entered in an agreed document register with revision, review stage and file format. Native EPLAN/DWG files, PDFs and XLSX/CSV registers are provided only when included in the RFQ. Optional items shown above are not included automatically.
See typical issued documents & formats ↗Related document example (in preparation): Gas Metering & Regulation Skid ↗
From project inputs
to review-ready files.
Client provides
- Approved P&IDs, equipment list and functional/design boundaries
- Current vendor package drawings, tags and instrument datasheets
- Instrument/motor quantities and required file formats (EPLAN, PDF, XLSX as agreed)
- Owner's standards register and controlled document numbering templates
Typical review activities
- Identify unresolved P&ID, tag and interface discrepancies
- Map device signals, terminal/wire IDs and instrument references
- Check BOM, I/O, loop and cable schedule consistency
- Issue comment register and agreed revision for client approval
Acceptance conditions
- Named engineering reviewer on customer's side
- Defined technical assumptions and change-control route
- Mutually approved deliverables, format and number of revisions
- Any site sign-off and regulated acceptance outside remote package
Equipment requirements.
Then local rules.
Listed standards are potential design references, not universal compliance claims. The responsible engineer confirms application, edition, contractual adoption and local rules.
Relevant technical codes
API MPMS (applicable chapters); relevant custody-transfer metrology rules; IEC 60079 if hazardous-area equipment; IEC 61082 / IEC 81346 for drawing structure and equipment identification where adopted.
Requirements vary by equipment construction and process classification.United Kingdom context
BS EN 60204-1 for machinery, BS EN IEC 61439 for applicable LV assemblies; site owner specifications.
BS 7671 for in-scope fixed electrical installations; UK conformity/market-placement route confirmed by manufacturer and responsible entity.
Fixed site installation and product documentation are separate work scopes.Excluded from this package
Meter proving, metrology certification, transaction calculations and safety-function approval stay with accountable metering parties.
No site classification, SIL verification, custody-transfer certification or process/pressure design is supplied in this standard documentation scope.Have a defined E&I
work package?
Share equipment type, project country, document register, available data and requested deliverables. No confidential drawings in the public form.
Discuss this engineering scope ↗The client retains process design authority, site engineering, statutory approvals and safety-function validation. Documentation outputs and review procedures are agreed before start.