OIL & GAS / PROCESS PACKAGES / AE / PACKAGE 03

Gas / Oil Separator Packages.

Electrical, instrumentation and control hardware documentation for defined subcontract packages in United Arab Emirates.

01 / EQUIPMENT & INTERFACES

Recognise the equipment.
Define the output.

three-phase separator · level transmitters · pressure control · interface level · shutdown valves

Possible remote documentation support for Separator skid manufacturer / E&I subcontractor. Final code basis, scope and deliverable register are agreed with the client.

three-phase separatorlevel transmitterspressure controlinterface levelshutdown valves
02 / ENGINEERING DELIVERABLES

A defined package.
Not a whole EPC contract.

These deliverables can be selected individually. Scope can be limited to drafting or document review under the client's engineering leadership.

01P&ID-to-I/O reconciliationIssued XLSX/CSV register: tags, signal types, destinations and source/revision references.
02Instrument IndexIssued XLSX/CSV register: tags, signal types, destinations and source/revision references.
03loop diagramsIssued numbered PDF drawing sheets; editable EPLAN/DWG source files where specified.
04junction box schedulesIssued controlled PDF and editable source/register where included in the agreed document register.
05valve signal listIssued XLSX/CSV register: tags, signal types, destinations and source/revision references.
06PLC cabinet documentationIssued controlled PDF and editable source/register where included in the agreed document register.
07 / OPTIONALI/O List / Signal Register (AI, AO, DI, DO)Signals, channel assignments and interfaces; optional if not already included.
08 / OPTIONALControl Panel GA / Internal LayoutMounting plate, DIN rails, wire ducts, devices and clearances; optional panel scope.
09 / OPTIONALBill of Materials (BOM) / Device ScheduleManufacturers, part numbers, quantities and references; optional panel scope.
Issued documentation, not just engineering hours.

Each selected deliverable is entered in an agreed document register with revision, review stage and file format. Native EPLAN/DWG files, PDFs and XLSX/CSV registers are provided only when included in the RFQ. Optional items shown above are not included automatically.

See typical issued documents & formats ↗
03 / CLIENT INPUTS & QA

From project inputs
to review-ready files.

Client provides

  • Approved P&IDs, equipment list and functional/design boundaries
  • Current vendor package drawings, tags and instrument datasheets
  • Instrument/motor quantities and required file formats (EPLAN, PDF, XLSX as agreed)
  • Owner's standards register and controlled document numbering templates

Typical review activities

  • Identify unresolved P&ID, tag and interface discrepancies
  • Map device signals, terminal/wire IDs and instrument references
  • Check BOM, I/O, loop and cable schedule consistency
  • Issue comment register and agreed revision for client approval

Acceptance conditions

  • Named engineering reviewer on customer's side
  • Defined technical assumptions and change-control route
  • Mutually approved deliverables, format and number of revisions
  • Any site sign-off and regulated acceptance outside remote package
04 / APPLICABLE REFERENCES

Equipment requirements.
Then local rules.

Listed standards are potential design references, not universal compliance claims. The responsible engineer confirms application, edition, contractual adoption and local rules.

TECHNOLOGY / PROCESS

Relevant technical codes

IEC 61511 for any SIS interfaces; IEC 60079 where area classified; owner piping/instrument specifications; IEC 61082 / IEC 81346 for drawing structure and equipment identification where adopted.

Requirements vary by equipment construction and process classification.
AE / MACHINE & ELECTRICAL

United Arab Emirates context

Project-adopted IEC equipment standards and EPC/OEM specifications; no assumption that one emirate’s rules govern another.

Emirate-specific rules, e.g. DEWA requirements in Dubai or relevant Abu Dhabi DoE rules for included electrical installations; registered local parties for approvals.

Fixed site installation and product documentation are separate work scopes.
CLIENT-OWNED RESPONSIBILITY

Excluded from this package

Process sizing, relief design, shutdown philosophy and SIL verification remain with owner-designated specialists.

No site classification, SIL verification, custody-transfer certification or process/pressure design is supplied in this standard documentation scope.
ASSEMBLY STANDARD / WHEN APPLICABLE

IEC 61439 and cabinet design

For in-scope low-voltage switchgear/controlgear assemblies, apply IEC 61439-1 together with the relevant product part (typically IEC 61439-2), subject to national adoption and the project specification. IEC 60204-1 may also apply to machine electrical equipment.

Engineering drawings are not evidence of assembly conformity. The responsible manufacturer retains design verification, routine verification, product conformity and approval duties unless separately assigned to a qualified party.
Other markets for this equipment
Kazakhstan ↗Uzbekistan ↗
05 / NEXT STEP

Have a defined E&I
work package?

Share equipment type, project country, document register, available data and requested deliverables. No confidential drawings in the public form.

Discuss this engineering scope ↗
REMOTE SUBCONTRACT BOUNDARY

The client retains process design authority, site engineering, statutory approvals and safety-function validation. Documentation outputs and review procedures are agreed before start.

← Back to equipment