Gas / Oil Separator Packages.
Electrical, instrumentation and control hardware documentation for defined subcontract packages in Kazakhstan.
Recognise the equipment.
Define the output.
three-phase separator · level transmitters · pressure control · interface level · shutdown valves
Possible remote documentation support for Separator skid manufacturer / E&I subcontractor. Final code basis, scope and deliverable register are agreed with the client.
A defined package.
Not a whole EPC contract.
These deliverables can be selected individually. Scope can be limited to drafting or document review under the client's engineering leadership.
Each selected deliverable is entered in an agreed document register with revision, review stage and file format. Native EPLAN/DWG files, PDFs and XLSX/CSV registers are provided only when included in the RFQ. Optional items shown above are not included automatically.
See typical issued documents & formats ↗From project inputs
to review-ready files.
Client provides
- Approved P&IDs, equipment list and functional/design boundaries
- Current vendor package drawings, tags and instrument datasheets
- Instrument/motor quantities and required file formats (EPLAN, PDF, XLSX as agreed)
- Owner's standards register and controlled document numbering templates
Typical review activities
- Identify unresolved P&ID, tag and interface discrepancies
- Map device signals, terminal/wire IDs and instrument references
- Check BOM, I/O, loop and cable schedule consistency
- Issue comment register and agreed revision for client approval
Acceptance conditions
- Named engineering reviewer on customer's side
- Defined technical assumptions and change-control route
- Mutually approved deliverables, format and number of revisions
- Any site sign-off and regulated acceptance outside remote package
Equipment requirements.
Then local rules.
Listed standards are potential design references, not universal compliance claims. The responsible engineer confirms application, edition, contractual adoption and local rules.
Relevant technical codes
IEC 61511 for any SIS interfaces; IEC 60079 where area classified; owner piping/instrument specifications; IEC 61082 / IEC 81346 for drawing structure and equipment identification where adopted.
Requirements vary by equipment construction and process classification.Kazakhstan context
Client-adopted IEC and ST RK/GOST/EAEU requirements for equipment and assemblies as applicable; technical regulation and edition must be verified.
Applicable PUE of Kazakhstan, ST RK/GOST and mining/industrial-safety rules; EAEU technical regulations only for products in their scope.
Fixed site installation and product documentation are separate work scopes.Excluded from this package
Process sizing, relief design, shutdown philosophy and SIL verification remain with owner-designated specialists.
No site classification, SIL verification, custody-transfer certification or process/pressure design is supplied in this standard documentation scope.IEC 61439 and cabinet design
For in-scope low-voltage switchgear/controlgear assemblies, apply IEC 61439-1 together with the relevant product part (typically IEC 61439-2), subject to national adoption and the project specification. IEC 60204-1 may also apply to machine electrical equipment.
Engineering drawings are not evidence of assembly conformity. The responsible manufacturer retains design verification, routine verification, product conformity and approval duties unless separately assigned to a qualified party.Have a defined E&I
work package?
Share equipment type, project country, document register, available data and requested deliverables. No confidential drawings in the public form.
Discuss this engineering scope ↗The client retains process design authority, site engineering, statutory approvals and safety-function validation. Documentation outputs and review procedures are agreed before start.
← Back to equipment