Skip to content
Home / Engineering Solutions / Pump Stations & Booster Sets
EQUIPMENT GROUP / 8 REGIONAL WORK PACKAGES

Pump Stations & Booster Sets.

PLC/RTU, VFD and instrumentation packages for water transfer, pressure boosting and irrigation pumping.

Duty / standbyVFDLevel / pressureTelemetry
01 / DEFINE THE ASSET

One equipment type.
Local engineering requirements.

Start from the object, its electrical and control interfaces, and the documents your team needs. The regional examples below show how a defined subcontract package changes across local markets and industries.

PROCUREMENT WORKFLOW
  1. Confirm equipment and process boundaries
  2. Choose installation market and client specifications
  3. Agree input drawings, deliverables and review cycles
  4. Request a scoped quotation and handover format
Representative scope models only; not evidence of previously delivered customer projects.
02 / COUNTRY & SCOPE

Choose your region.
Review the deliverables.

These are documented examples from the current solutions library, not an exhaustive list of countries where similar assets exist.

NL / REGIONAL ENGINEERING CONTEXT

Netherlands

See all Netherlands solutions ↗
SOL-007 / REPRESENTATIVE SCOPEWater Technology

Industrial Wastewater Pump Station — RTU Panel

wet well, level sensors, VFD, duty/standby, telemetry

Typical contractor deliverables
  • RTU wiring
  • I/O & alarms
  • panel diagrams
  • terminal plan
Engineering / product references

EN/IEC 60204-1 for machinery; EN/IEC 61439 for applicable assemblies; IEC 61131 if PLC software is in scope

Local/site context

NEN 1010:2020+C1:2024 for site low-voltage installations

UK / REGIONAL ENGINEERING CONTEXT

United Kingdom

See all United Kingdom solutions ↗
SOL-013 / REPRESENTATIVE SCOPEWater / AMP8 supply chain

Pumping Station MCC/RTU Documentation

MCC, wet well level, motor starter, telemetry, pump controls

Typical contractor deliverables
  • MCC schedules
  • terminal diagrams
  • I/O
  • cable-core schedule
Engineering / product references

BS EN IEC 61439 (LV assembly); BS EN 60204-1 where machine

Local/site context

BS 7671:2018+A4:2026 for site installations; owner WIMES if specified

SOL-015 / REPRESENTATIVE SCOPECommercial Water

Booster Pump Set Controls

cold water booster, duty/assist, pressure transmitters, VFDs

Typical contractor deliverables
  • Panel schematics
  • I/O
  • pump/motor list
  • cable schedule
Engineering / product references

BS EN IEC 60204-1 for machinery; BS EN IEC 61439 for applicable assemblies

Local/site context

BS 7671 fixed installation

RO / REGIONAL ENGINEERING CONTEXT

Romania

See all Romania solutions ↗
SOL-025 / REPRESENTATIVE SCOPEPrivate Agriculture

Irrigation Pump Station — PLC/VFD Panel

private irrigation, well pumps, pressure sensor, VFD

Typical contractor deliverables
  • Panel wiring
  • I/O
  • cable list
  • instrument tags
Engineering / product references

SR EN 60204-1 where machine; SR EN IEC 61439 if LV assembly

Local/site context

I7-2011 (amended) where building installation

AE / REGIONAL ENGINEERING CONTEXT

United Arab Emirates

See all United Arab Emirates solutions ↗
SOL-038 / REPRESENTATIVE SCOPECommercial Buildings

Domestic Water Booster Pump Set Controls

booster skid, VFD duty/standby, pressure, low-water trip

Typical contractor deliverables
  • Panel schematics
  • cable list
  • I/O
  • BOM
Engineering / product references

IEC 61439 applicable LV assemblies; OEM package requirements

Local/site context

Dubai DEWA / Abu Dhabi DoE wiring rules for site work

GE / REGIONAL ENGINEERING CONTEXT

Georgia

See all Georgia solutions ↗
SOL-046 / REPRESENTATIVE SCOPEAgriculture

Vineyard / Orchard Irrigation Controls

irrigation booster, filters, solenoid valves, level sensors

Typical contractor deliverables
  • RTU/PLC control panel
  • I/O
  • wiring drawings
  • cable list
Engineering / product references

IEC 60204-1 where machinery; OEM specs

Local/site context

Project/local site regulations for power connection

KZ / REGIONAL ENGINEERING CONTEXT

Kazakhstan

See all Kazakhstan solutions ↗
SOL-057 / REPRESENTATIVE SCOPEIndustrial Utilities / Water

Industrial Pump Station — PLC/RTU & Instrumentation

pump station; duty/standby; RTU; flowmeter; pressure transmitter; VFD

Typical contractor deliverables
  • Cabinet schematics
  • Instrument Index
  • I/O
  • Cable and terminal schedules
Engineering / product references

IEC 60204-1 / IEC 61439 and GOST / ST RK only where required by specifications, manufacturer standards or applicable regulation

Local/site context

Kazakhstan electrical installation rules (PUE), Ministry of Energy Order No. 230 (check amendments); local authorised designer handles installation approval

UZ / REGIONAL ENGINEERING CONTEXT

Uzbekistan

See all Uzbekistan solutions ↗
SOL-063 / REPRESENTATIVE SCOPEPrivate Agricultural Water

Irrigation Booster Pump Station — PLC/RTU Cabinets

irrigation; irrigation pump; VFD; level transmitter; flowmeter; telemetry; RTU

Typical contractor deliverables
  • RTU/PLC panel schematics
  • I/O
  • motor and cable list
  • alarm matrix
Engineering / product references

IEC 60204-1 / IEC 61439 / O‘z DSt / GOST: confirm contractual adoption and applicable national technical regulations

Local/site context

Uzbekistan electrical installation rules (PUE), Order No. 84 (Section I); connection and commissioning approvals follow separate applicable legislation, not cabinet design rules

START YOUR ENGINEERING PACKAGE

Similar equipment?
Let's define the scope.

Send the equipment description, destination, project code basis, input document register and expected native deliverables.

Submit engineering RFQ ↗
DEFINED RESPONSIBILITIES

Native CAD and engineering documentation can be scoped separately from electrical installation, local permits, machine conformity assessment and regulated engineering sign-off.

Contracting & professional assurance →