Named outputs
Each document has an agreed title, reference, stage, revision, source format and responsible reviewer.
Defined E&I, instrumentation and control-hardware documentation packages. The final deliverable register is agreed in your RFQ — with document content, formats, review gates and responsibility boundaries.
Select the documents you need for a PLC cabinet, MCC, VFD panel or skid-mounted control package. These are distinct deliverables; a schematic-only order does not automatically include the full manufacturing package.
| Document / deliverable | What is actually issued | Typical files | Scope |
|---|---|---|---|
| Electrical SchematicsPower & control circuits | Single-line/multiline power and control diagrams, device IDs, cross-references, PLC power and wiring interfaces | EPLAN P8 / DWG + PDF | Selectable |
| Panel General Arrangement (GA) / Layout2D / 3D where agreed | Enclosure dimensions, mounting plate, devices, DIN rails, cable ducts, assembly arrangement and space assumptions | EPLAN Pro Panel / DWG + PDF | Panel scope |
| Bill of Materials (BOM)Device / component schedule | Designators, manufacturers, model/part numbers, technical description, quantities and approved substitutions if agreed | XLSX / CSV + PDF | Selectable |
| I/O List / Signal RegisterAI · AO · DI · DO | Tags, signal types, ranges where supplied, module/channels, PLC/RTU allocation, terminal and field interface references | XLSX / CSV | Automation scope |
| Terminal Diagrams & Wiring Reports | Terminal strips, device-to-terminal wiring, wire IDs, cross-references and terminal connection schedules | EPLAN / PDF + XLSX | Panel scope |
| Cable Schedule | Cable IDs, cable type, from/to equipment, cores, destinations and termination data where available | XLSX / PDF | If cabling included |
| Power & Thermal Design Notes | 24 V DC load estimates, component heat-loss schedule, space/derating assumptions and calculation outputs | XLSX / PDF | Separate agreed task |
When the package is a low-voltage switchgear/controlgear assembly, the design basis may include IEC/EN 61439-1 together with the applicable product part, frequently IEC/EN 61439-2. For machine electrical equipment, IEC/EN 60204-1 may be relevant. The responsible manufacturer or appointed qualified party retains assembly design verification, routine verification and product conformity obligations.
| Document / deliverable | Typical issued content | Typical files |
|---|---|---|
| Instrument Index | Unique instrument tags, service, measurement duty, P&ID reference and package boundary | XLSX / CSV |
| I/O List / Signal Register | Instrument/control tag, signal type (AI/AO/DI/DO), system destination, interface and allocation | XLSX / CSV |
| Instrument Loop Diagrams | Field device → junction box → marshalling → system I/O, when within contracted boundary | PDF + editable CAD as agreed |
| Instrument Datasheets | Structured device data transcribed from approved process/design inputs, unresolved assumptions marked | XLSX / DOCX / PDF |
| Field Cable & Junction Box Schedules | Field cable routes/interfaces, terminal allocation and device references where documented | XLSX / PDF |
| Vendor Document Review Register | Review comments, document references, interface gaps and close-out status | XLSX / PDF |
Process conditions, protective-function decisions, hazardous-area classification and custody-transfer approval are input/approval responsibilities of the project’s authorised disciplines, not automatically included in a drafting subcontract.
Each document has an agreed title, reference, stage, revision, source format and responsible reviewer.
Native EPLAN/DWG files, PDF drawing issue, and XLSX/CSV data registers. Software version and licence/access method agreed beforehand.
Comment matrix, assumptions and discrepancy log, drawing/register consistency checks, agreed revision cycle.
Client or designated responsible engineer approves technical decisions. Physical fabrication, FAT execution, certification and statutory sign-off require separate scope.
Illustrative deliverable list for discussion, not a previously delivered client project. Final selection depends on the agreed RFQ.
| ID | Deliverable | Typical format |
|---|---|---|
| EL-001 | Electrical schematics | EPLAN P8 + PDF |
| EL-002 | Control cabinet GA / layout | EPLAN Pro Panel or DWG + PDF |
| EL-003 | Bill of Materials (BOM) | XLSX + PDF |
| IC-001 | I/O List (AI/AO/DI/DO) | XLSX / CSV |
| EL-004 | Terminal & wiring reports | EPLAN / PDF / XLSX |
| PM-001 | Drawing & revision register | XLSX / PDF |
Share the equipment, market, available inputs and preferred issue formats. I will define a document-based scope with revision and acceptance points before quotation.
Sample registers and reserved gallery slots for three engineering demonstration packages.