TECHNICAL SCOPE / DOCUMENT ISSUANCE

Exactly what
your team receives.

Defined E&I, instrumentation and control-hardware documentation packages. The final deliverable register is agreed in your RFQ — with document content, formats, review gates and responsibility boundaries.

01 / CONTROL PANEL & PLC HARDWARE

Drawings and schedules.
Not just CAD hours.

Select the documents you need for a PLC cabinet, MCC, VFD panel or skid-mounted control package. These are distinct deliverables; a schematic-only order does not automatically include the full manufacturing package.

Document / deliverableWhat is actually issuedTypical filesScope
Electrical SchematicsPower & control circuitsSingle-line/multiline power and control diagrams, device IDs, cross-references, PLC power and wiring interfacesEPLAN P8 / DWG + PDFSelectable
Panel General Arrangement (GA) / Layout2D / 3D where agreedEnclosure dimensions, mounting plate, devices, DIN rails, cable ducts, assembly arrangement and space assumptionsEPLAN Pro Panel / DWG + PDFPanel scope
Bill of Materials (BOM)Device / component scheduleDesignators, manufacturers, model/part numbers, technical description, quantities and approved substitutions if agreedXLSX / CSV + PDFSelectable
I/O List / Signal RegisterAI · AO · DI · DOTags, signal types, ranges where supplied, module/channels, PLC/RTU allocation, terminal and field interface referencesXLSX / CSVAutomation scope
Terminal Diagrams & Wiring ReportsTerminal strips, device-to-terminal wiring, wire IDs, cross-references and terminal connection schedulesEPLAN / PDF + XLSXPanel scope
Cable ScheduleCable IDs, cable type, from/to equipment, cores, destinations and termination data where availableXLSX / PDFIf cabling included
Power & Thermal Design Notes24 V DC load estimates, component heat-loss schedule, space/derating assumptions and calculation outputsXLSX / PDFSeparate agreed task
IEC 61439 — equipment-dependent

When the package is a low-voltage switchgear/controlgear assembly, the design basis may include IEC/EN 61439-1 together with the applicable product part, frequently IEC/EN 61439-2. For machine electrical equipment, IEC/EN 60204-1 may be relevant. The responsible manufacturer or appointed qualified party retains assembly design verification, routine verification and product conformity obligations.

02 / INSTRUMENTATION & PROCESS SKIDS

Measurable interfaces.
Traceable documentation.

Document / deliverableTypical issued contentTypical files
Instrument IndexUnique instrument tags, service, measurement duty, P&ID reference and package boundaryXLSX / CSV
I/O List / Signal RegisterInstrument/control tag, signal type (AI/AO/DI/DO), system destination, interface and allocationXLSX / CSV
Instrument Loop DiagramsField device → junction box → marshalling → system I/O, when within contracted boundaryPDF + editable CAD as agreed
Instrument DatasheetsStructured device data transcribed from approved process/design inputs, unresolved assumptions markedXLSX / DOCX / PDF
Field Cable & Junction Box SchedulesField cable routes/interfaces, terminal allocation and device references where documentedXLSX / PDF
Vendor Document Review RegisterReview comments, document references, interface gaps and close-out statusXLSX / PDF

Process conditions, protective-function decisions, hazardous-area classification and custody-transfer approval are input/approval responsibilities of the project’s authorised disciplines, not automatically included in a drafting subcontract.

03 / ISSUANCE & ACCEPTANCE

How the files
are handed over.

01 / DOCUMENT REGISTER

Named outputs

Each document has an agreed title, reference, stage, revision, source format and responsible reviewer.

02 / NATIVE + VIEWABLE FILES

Editable when scoped

Native EPLAN/DWG files, PDF drawing issue, and XLSX/CSV data registers. Software version and licence/access method agreed beforehand.

03 / DESIGN REVIEW

Traceable changes

Comment matrix, assumptions and discrepancy log, drawing/register consistency checks, agreed revision cycle.

04 / RESPONSIBILITY SPLIT

Clear approvals

Client or designated responsible engineer approves technical decisions. Physical fabrication, FAT execution, certification and statutory sign-off require separate scope.

SAMPLE / DOCUMENT REGISTER

Example: PLC Control Cabinet

Illustrative deliverable list for discussion, not a previously delivered client project. Final selection depends on the agreed RFQ.

IDDeliverableTypical format
EL-001Electrical schematicsEPLAN P8 + PDF
EL-002Control cabinet GA / layoutEPLAN Pro Panel or DWG + PDF
EL-003Bill of Materials (BOM)XLSX + PDF
IC-001I/O List (AI/AO/DI/DO)XLSX / CSV
EL-004Terminal & wiring reportsEPLAN / PDF / XLSX
PM-001Drawing & revision registerXLSX / PDF
TECHNICAL RFQ

Send your required document list.

Share the equipment, market, available inputs and preferred issue formats. I will define a document-based scope with revision and acceptance points before quotation.

Discuss your deliverables ↗
FROM DELIVERABLE LIST TO REAL FILES
See how these document types fit together.

Sample registers and reserved gallery slots for three engineering demonstration packages.

Engineering Work Samples ↗